IRC §45Y · production credit
Section 45Y: selling the Clean Electricity Production Credit
The technology-neutral production credit for clean power from facilities placed in service in 2025 or later, sold one facility and one year at a time.
Verified · IRS Form 7211, Clean Electricity Production Credit
At a glance · §45Y
- What it rewards
- Each kilowatt-hour of electricity produced at a zero-emissions facility placed in service after 2024 and sold to an unrelated person.
- Type
- Production credit (PTC): earned per unit produced or sold
- Rate
- 0.3¢/kWh base; 1.5¢/kWh (five times) if prevailing wage and apprenticeship requirements are met; both adjusted for inflation each year. Energy-community and domestic-content bonuses add 10% each.
- Credit period
- 10 years from the date the facility is placed in service. A transfer election is made separately for each facility and each year.
- Claimed on
- Form 7211, carried to Form 3800
- Transferable?
- Yes, under §6418. Not to a specified foreign entity (tax years beginning after 4 July 2025).
- Status
- Open The same wind and solar cliff as §48E applies, with the same material-assistance test for construction starting after 2025. Other technologies phase down for construction starting after 2032.
- Key dates
- : No transfers of these credits to a specified foreign entity
- : Material-assistance test applies to construction starting after this date
- : Wind and solar: last day to begin construction without the 2027 cliff
- : Wind and solar started after 4 July 2026 must be in service by this date
- : §45Y and §48E phase down for construction starting after 2032
- Last verified
Who earns it and how it is measured
The credit is earned on each kilowatt-hour produced at a qualified facility placed in service after 2024, whose greenhouse-gas emissions rate is zero or less, and sold to an unrelated person[1]. The technology does not matter; the emissions rate does.
The base amount is 0.3¢ per kWh, and 1.5¢ (five times the base) when the facility meets the prevailing wage and apprenticeship requirements; both figures are adjusted for inflation each year[1]. The credit runs for 10 years from the date the facility is placed in service.
A facility gets one credit or the other: §45Y does not apply to a facility for which §45, §45Q, §45U, §48 or §48E has been allowed[1].
Bonus amounts and the documents that prove them
Located in an energy community, or built with qualifying domestic content, the facility earns a 10% increase for each[1]. Keep the location analysis and the domestic-content certifications with the facility file; a buyer will ask for both. A buyer must receive a proportionate share of any bonus amount; bonuses cannot be sold separately from the base credit[2].
Selling it
A production credit is sold separately for each facility and each tax year of the 10-year period[3]. That makes §45Y flexible: you can sell this year’s credits now and decide on later years later, or sign a multi-year agreement (a “PTC strip”); Crux counted nearly $9 billion of long-term strips bought in 2025[4].
- Register each facility with the IRS and renew the registration for each year in which you elect to transfer[5]. The IRS asks for registration at least 120 days before the return’s due date, extensions included[6].
- Claim on Form 7211[7] and report the transfer on Form 3800, Part III, column (f)[8].
- Attach the transfer election statement to an original, timely return; the election cannot be added on an amended return[9].
What buyers ask for on a §45Y deal: metered production and sales records; the emissions-rate basis for the technology; prevailing wage and apprenticeship records if you claim the 1.5¢ rate; bonus evidence; and, for construction that began after 31 December 2025, the material-assistance analysis. Because there is no recapture on a production credit, §45Y generally prices above investment credits.
What changed in 2025
- Wind and solar cliff. A wind or solar facility placed in service after 31 December 2027 earns no §45Y credit, unless its construction began on or before 4 July 2026[1]. Construction that had not begun before 2 September 2025 must meet the physical work test; the 5% safe harbor remains only for solar of 1.5 MW (AC) or less[10].
- Material assistance. A facility whose construction begins after 31 December 2025 is not a qualified facility if it includes material assistance from a prohibited foreign entity[1], measured against a cost-ratio threshold that starts at 40% for 2026[11].
- No transfers to a specified foreign entity for tax years beginning after 4 July 2025[3].
- Phase-down. For other technologies the “applicable year” is now fixed at 2032: full credit for construction beginning in 2033, 75% in 2034, 50% in 2035, nothing after[1].
Common mistakes
- Claiming §45Y on Form 8835. Form 8835 is for the legacy §45 credit[12]; §45Y production sold after 2024 goes on Form 7211[7].
- Forgetting the annual renewal of the registration number for each year you sell[5].
- Selling more than the facility produced. If the buyer claims more than the credit actually determined, the excess is an excessive credit transfer: the buyer repays it plus a 20% penalty unless it shows reasonable cause[3].
Frequently asked questions
Can you use Form 8835 to claim a §45Y credit?
No. The IRS form for §45Y is Form 7211, “Clean Electricity Production Credit”[7].
Can I sell several years at once?
The election is made year by year, but nothing stops a seller and buyer agreeing today on future years’ credits; the cash for each year must still be paid within that year’s payment window[2].
Is §45Y on the §6418 list?
Yes, the clean electricity production credit is an eligible credit[3].
Market price
About $0.917 on average in 2026; $0.92 to $0.96 for investment-grade sellers.[Cenet Capital]
Market estimate, not an offer. Prices move with buyer demand, deal size, seller credit quality, insurance and foreign-entity exposure. Run your own figures in the Credit Value Estimator, or compare every published report on the prices page.
Deadlines for §45Y
- No transfers of these credits to a specified foreign entityFor tax years beginning after 4 July 2025, credits under §§45Q, 45U, 45X, 45Y, 45Z and 48E may not be transferred to a specified foreign entity.
- Stricter begin-construction test for wind and solarFor wind and solar facilities that had not begun construction before 2 September 2025, only the physical work test can establish the start of construction; the 5% cost safe harbor survives only for solar facilities of 1.5 MW AC or less.
- Material-assistance test applies to construction starting after this dateFacilities and storage whose construction begins after 31 December 2025 get no §45Y or §48E credit if they include material assistance from a prohibited foreign entity (cost-ratio thresholds start at 40% for facilities and 55% for storage in 2026).
- Wind and solar: last day to begin construction without the 2027 cliffWind and solar facilities whose construction began on or before 4 July 2026 are not subject to the 31 December 2027 placed-in-service deadline (Notice 2025-42's continuity safe harbor gives four calendar years after the year construction began).
- Wind and solar started after 4 July 2026 must be in service by this dateA wind or solar facility whose construction began after 4 July 2026 earns no §45Y or §48E credit unless it is placed in service by 31 December 2027.
- §45Y and §48E phase down for construction starting after 2032Non-wind, non-solar facilities beginning construction in 2033 get 100% of the credit, in 2034 75%, in 2035 50%, and nothing after.
Sources
- 26 U.S.C. § 45Y — Clean electricity production credit
- 26 CFR § 1.6418-1 — Transfer of eligible credits (definitions)
- 26 U.S.C. § 6418 — Transfer of certain credits
- Crux's 2025 market intelligence report: what tax credit buyers need to know (19 Mar 2026)
- 26 CFR § 1.6418-4 — Additional information and registration
- Register for elective payment or transfer of credits (page updated 12 Aug 2026)
- About Form 7211, Clean Electricity Production Credit
- Instructions for Form 3800 (2025)
- 26 CFR § 1.6418-2 — Rules for making transfer elections
- Notice 2025-42 — Beginning of construction for wind and solar facilities under §§ 45Y and 48E
- 26 U.S.C. § 7701(a)(51)–(52) — Prohibited foreign entity; material assistance
- About Form 8835, Renewable Electricity Production Credit
- Tax credit price calculator: what is your credit worth in cash? (7 Oct 2026)
- 26 U.S.C. § 48E — Clean electricity investment credit
- Notice 2026-15 — Interim safe harbors for material assistance from a prohibited foreign entity